Factory Acceptance Test

Certainty of the ordered product quality and functionality

Your Benefits

  • Examination of the ordered products and their delivery
  • Protection of the quality and functionality of the products
  • For system integrators: Protection of your own customers
  • Confirmation of functionality with an approval and test protocol
  • Insight into the SICK operating principle and production process

Overview

Certainty of the ordered product quality and functionality

SICK offers a factory acceptance test to ensure that products work like the customer ordered them. That means, before sending out the goods, a SICK team of experts tests the products in the presence of the customer using a device-specific protocol. The test is done at SICK. The extent of the thorough check depends on the type of order and any customer-specific requirements. The test serves as verification that the products fulfill the functional requirements of the customer. The customer receives an approval and test protocol which confirms the functionality of the products. The factory acceptance test offers the customer the chance to get to know the SICK operating principle directly on-site. The customer also gets insight into the SICK production process.

At a glance
  • Inspection of the ordered products for completeness, quality and function
  • Execution of tests at the respective SICK production site
  • Insight into the production of comparable products
  • Acceptance and test report

 

Phone-in Technical Support and Customer Care

8 a.m. – 5 p.m. Central Time, call 1-800-325-7425 and follow the prompts.

For emergency and critical care calls outside of normal business hours (5 p.m. – 8 a.m. Central Time), call 1-800-325-7425 and follow the prompts. You will be connected to a call center where your information will be forwarded to the appropriate department for follow up on a next available basis.

Technical overview

 
  • Technical data overview

    Technical data overview

    Specifications sheet

    Factory acceptance test

    CORE factory acceptance test – max. 3 devices

    CORE factory acceptance test – max. 6 devices

    PRME Extractice factory acceptance test – max. 6 devices

    PRIME+ Extractive factory acceptance test – single device

    PRIME Extractive factory acceptance test – max. 3 devices

    PRIME In-situ factory acceptance test – max. 3 devices

    PRIME In-situ factory acceptance test – max. 6 devices

    PrerequisitesThe order must take place at least 4 weeks before delivery
    Repair, maintenance

    Factory tour

    Visual test of the devices

    Examination of the device dimensions

    Examination of the documentation

    Creation of a test record

    Function check

    Signal test using simulated signals

    Clarification of technical questions

    Signal test with test gas task

    Documentation

    Protocol of the factory acceptance test

    Technical drawings

    Operating instructions

    Certificates

    Conformity declaration

    Duration

    1 day

    1 to 2 days

All technical data can be found accompanying the individual product