Verification and Optimization

Safe and regularly inspected
System operators are responsible for conducting their operations safely and productively. Complying with legal requirements and ensuring the safety of people and the environment are essential. With Verification & Optimization from SICK LifeTime Services, SICK ensures that the safety and reliability of equipment is guaranteed. The experts at SICK set themselves apart with many years of experience and extensive knowledge. As a result, errors and downtime are significantly reduced to ensure operations run smoothly.
10 results:
Creating MID conformity for billable systems
- Inspection of system for conformity according to the relevant EU-type examination certificate
- Metrological tests carried out
- System protected against manipulation by attaching the prescribed labels and securing elements
- Testing documentation produced and handover of compliance documents
- Inspection of ambient conditions, damage, alignment and contamination of the SICK product
- Inspection of performance
- Function and communication test
Inspection, maintenance, and restoration of defined functions
- Inspection of ambient conditions, damage, alignment, and contamination of SICK components and systems
- Restoration of defined functions
- Inspection and adjustment of application-specific parameters (except for calibrated systems)
- Archiving of parameters, acceptance test, and handover to the personnel
- Inspection of the ordered products for completeness, quality and function
- Execution of tests at the respective SICK production site
- Insight into the production of comparable products
- Acceptance and test report
Maximum process reliability thanks to calibration
- Functional check by trained personal
- Performance of calibration
- Evaluation of measured value deviation
- Verification under laboratory conditions
- Documentation based on calibration log
- Investigation of the circumstances of the accident or incident
- Identification of the cause of the accident
- Recommendation of measures to prevent other incidents or accidents
- Determination of the correct function of the protective bonding circuit as per the requirements of IEC 60204-1
- Determination of the contact resistances and leakage currents
- Production of a test record, which also describes any defects
- Production of an inspection report
Efficient and professional checking of protective devices
- Checking of the condition of the protective device and whether it is operating in accordance with the use of the machine
- Checking for correct installation and mounting
- Detailed inspection report and issuing of a test seal if the inspection was passed
- Inspection of the major mechanical hazards on a machine
- Inspection of all technical protective devices for correct alignment, installation, and functionality
- Inspection of the function and operation of electrical, pneumatic, and hydraulic safety-related control measures
- Production of an inspection report
- Inspection of linearity and zero point drift under laboratory conditions
- Customer-specific test gas concentrations and measuring ranges
- Measurement period is up to 72 hours
- Submission of a test report when the test is complete
- Execution of the test at the respective SICK production site